Panemunė by-pass
back  |  print
General Information
 
Title of the project:
Construction of Panemune and Sovetsk by-pass with a bridge over Neman River
 
Programme:
Lithuania-Poland-Russia Cross Border Co-operation Programme 2007-2013 under European Neighbourhood and Partnership Instrument
 
Subject of the project:
Infrastructure (roads, buildings, transport)
 
Priority:
1. Contributing to solving common problems and challenges
 
Measure:
1.2. Accessibility improvement
 
Lead Partner (Beneficiary):
Lithuanian Road Administration under the Ministry of Transport and Communications (Lithuania)
 
Partner:
State Governmental agency of the Kaliningrad region "Road Department of the Kaliningrad region" (Russia)
 
Total budget:
27,386,690.00 EUR (94,560,763.23 Lt)
 
Programme contribution:
10,000,000.00 EUR (34,528,000.00 Lt)
 
Duration:
24 months (January 2013 – December 2014)
 
According to the Project, the Panemunė by-pass will be built on the territory of Pagėgiai municipality of Tauragė region of the Republic of Lithuania and will be connected with a new bridge over Neman River and Sovetsk by-pass to be constructed by the Partner from the Russian Federation. The Panemunė by-pass will be part of road A12 (E77) Riga–Šiauliai–Tauragė–Kaliningrad and of IA transport corridor (VIA HANSEATICA), which is an important connection of the European Union road network.
The overall objective of the Project is to contribute to the improvement of traffic conditions for transit and long distance transport between the Lithuanian Republic and Kaliningrad Region of the Russian Federation on IA transport corridor, as well as to reducing vehicles-related problems (traffic jams, noise, air pollution) faced by the inhabitants of Panemunė settlement (Lithuania) and Sovetsk town (Russia).
The Financial Project analysis shows that although the project does not generate direct income, it provides social and economic benefits to society.The estimated internal rate of return of the Project (evaluating Panemunė bypass to be constructed on the territory of Lithuania and Sovetsk bypass with a bridge over Neman River to be constructed on the territory of the Russian Federation) is 41.88%.
When the implementation of the Project is finished and transport traffic is diverted to a by-pass, the following benefits will be achieved:
  • Reduced negative environmental impact
  • Reduced accident rate
  • Improved traffic and border crossing conditions
  • Reduced vehicle operating costs.
After implementation of the project the following results will be achieved:
  • Construction of a road section (length – 4 km).
  • Construction of the “fly-over” (length – 0.463 km) over the old water course of river Neman.
  • Construction of the bridgehead (length – 0.085 km) providing connection with the new bridge, which should be built over Neman River by the Russian Federation.
 
 
 
The Lithuania-Poland-Russia European Neighbourhood and Partnership Instrument Cross-border Cooperation Programme 2007-2013 aims at promoting economic and social development on both sides of the EU-Russian border, addressing common challenges and problems and promoting people-to-people co-operation. Under the Programme, legal non-profit entities from the Lithuanian and Polish border regions and the entire Kaliningrad oblast implement joint projects co-financed by the EU.
The European Union is made up of 28 Member States who have decided to gradually link together their know-how, resources and destinies. Together, during a period of enlargement of 50 years, they have built a zone of stability, democracy and sustainable development whilst maintaining cultural diversity, tolerance and individual freedoms. The European Union is committed to sharing its achievements and its values with countries and peoples beyond its borders.
The contents of this publication are the sole responsibility of the Lithuanian Road Administration under the Ministry of Transport and Communications and can in no way be taken to reflect the views of the European Union.
 
top
Grant Contract / EU Assistance
 
 
 
Lithuanian Road Administration under the Ministry of Transport and Communications of the Republic of Lithuania and the Ministry of Regional Development of Poland, which is the Joint Managing Authority of the Lithuania-Poland-Russia Cross Border Co-operation Programme 2007-2013 under European Neighbourhood and Partnership Instrument (hereinafter referred to as Programme), have signed Grant Contract ILPR.01.02.01-72-007/10-00 on 28 December 2012. According to this Contract, the Programme assistance of 10 million EURO (34.5 million LTL) has been allocated for the implementation of the Project Construction of Panemune and Sovetsk by-pass with a bridge over Neman River.
  
The contents of this publication are the sole responsibility of the Lithuanian Road Administration under the Ministry of Transport and Communications and can in no way be taken to reflect the views of the European Union.
 
top
Contract Agreement on Construction Works
 
It is planned to construct Panemune Eastern by-pass, which will be connected with the bridge over Neman and Kaliningrad region (Russia)  
 
The tender opening session related to purchasing of the project „Construction of Panemune and Sovetsk by-pass with a bridge over Neman River“ works was held on 19 March 2013. Tenderers, which have submitted their tenders, were as follows: UAB Šiaulių plentas, UAB Hidrostatyba, AB Panevėžio keliai, AB Kauno tiltai, UAB Alkesta, as well as joint venture of AB LATVIJAS TILTI and UAB Kauno keliai. The Tender Evaluation Committee has examined all the received tenders and has decided that the winner is joint venture of AB LATVIJAS TILTI and UAB Kauno keliai.
 
The Lithuanian Road Administration under the Ministry of Transport and communications of the Republic of Lithuania and AB Lativjas tilti (Leading partner of joint venture of AB Lativjas tilti and UAB Kauno keliai) have signed works contract on 10 July 2013. Value of contract excluding VAT is 70.066 million LTL (VAT is 14.714 million LTL).
 
The contract will be co-financed by the Lithuania-Poland-Russia Cross Border Co-operation Programme 2007-2013 under European Neighbourhood and Partnership Instrument. The amount of allocated grant is 34.528 million LTL.
 
According to the signed works contract it is planned to perform the following works on the road E77 (A12) Ryga–Šiauliai–Tauragė–Kaliningradas section 183,90–187,90 km: to construct Panemune Eastern by-pass (the total length – 4 m) including fly-over (length – 0.463 km) and bridgehead (length – 0.085 km) insuring connection with new bridge over Neman river, which will be built by the Russian Federation.
 
All the works should be carried out in close co-operation between institutions and contractors of both countries (Russia and Lithuania). The Parliament of the Republic of Lithuania (Seimas) has ratified the agreement (on 17 October 2012), related to construction of the bridge over Neman River and signed by the Government of Russia and the Government of Lithuania.  
 
The internal rate of return of the Project is 41.88%. Planned works execution date – October 2014.
 
The contents of this publication are the sole responsibility of the Lithuanian Road Administration under the Ministry of Transport and Communications and can in no way be taken to reflect the views of the European Union.
top
Project Implementation / Photos
 
 
 
September, 2013
 
 
 Project billboard
 
 
 Laying of non-woven geotextile
 
 
 Construction of road embankment, soil compaction
 
 
Reinforcement frames for piles
 
 
 Project billboard
 
 
 
Construction of piles (bridge support No 2) of fly-over the old water course of the river Neman
 
 
 
 
October, 2013
 
 
 
Reinforcement knotting for support
 
 
 Construction of timbering of fly-over the old water course of the river Neman
 
 
 Construction of support column of fly-over the old water course of the river Neman
 
 
Construction of road embankment, soil compaction
 
 
 Steel poles of retaining wall
 
 
 
 
November, 2013
 
 
 Intermediate support of fly-over the old water course of the river Neman
 
 
 Front support of fly-over the old water course of the river Neman
 
 
Construction of piles of fly-over the old water course of the river Neman
 
 
Concrete reinforcement of slopes of road embankment
 
 
Concrete reinforcement of slopes of road embankment
 
 
 Construction of retaining wall
 
 
 
 
December, 2013
 
 
Construction of piling
 
 
Construction of support of fly-over the old water course of the river Neman
 
 
 Reinforcement knotting for fly-over the old water course of the river Neman
 
 
 Concrete reinforcement of slopes of road embankment
 
 
Production of metal structures for fly-over the old water course of the river Neman
 
 
 Production of metal structures for fly-over the old water course of the river Neman
 
 
 
 
January, 2014
 
 
Reinforcement of slopes of road embankment
 
 
Concrete reinforcement of slopes (in geosynthetic falseworks) of road embankment
 
 
Construction of road embankment
 
 
Assemblage of metal structures for fly-over the old water course of the river Neman Tilto
 
 
Construction of support of fly-over the old water course of the river Neman
 
 
Assemblage of metal structures for fly-over the old water course of teh river Neman Tilto
 
 
 
 
February, 2014
 
 
 Pushing of metal span of fly-over the old water course of the river Neman
 
 
 Pushing of metal span of fly-over the old water course of the river Neman. Stage II
 
 
 Piles of support No. 9 of fly-over the old water course of the river Neman
 
  
 Assemblage of metal structures and console hanging of fly-over the old water course of the river Neman
 
 
Foundation concreting for support No. 10 of fly-over the old water course of the river Neman
 
 
 Metal span of fly-over the old water course of the river Neman
 
 
 
 
March, 2014
 
 
 Timbering of support column of fly-over the old water course of the river Neman
 
 
 Support of fly-over the old water course of the river Neman
 
 
 Assemblage of metal span of fly-over the old water course of the river Neman
 
 
 Reinforcement knotting for support column of bridgehead
 
 
 Timbering of support column of fly-over the old water course of the river Neman
 
 
 Metal span of fly-over the old water course of the river Neman
 
 
 
 
April, 2014
 
Waterproofing of column and foundation of the bridgehead support
 
 
 Reinforcement and timbering of retaining wall rigel
 
 
 Metal span of fly-over the old water course of the river Neman
 
 
Surface preparation of the bridgehead support No. 1 - for application of protective layer
 
 
 Pushing of metal span of fly-over the old water course of the river Neman
 
 
 Construction of road embankment
 
 
 
 
May, 2014
 
 
 Thickness inspection of Interzinc52 layer of metal span of fly-over the old water course of the river Neman
 
 
Reinforcement knotting and formwork mounting of retaining wall of support No 12 of fly-over the old water course of the river Neman
 
 
Reinforcement knotting of transition plate of the bridgehead support No 1
 
 
Mounting of spherical bearing part of fly-over the old water course of the river Neman 
 
 
Watering of road embankment 
 
 
Construction of frost resisitent layer of sand
 
 
 
 
June, 2014
 
 
Concrete cubs to determine the compressive stregth of concrete used for concreting of road embankment slopes
 
 
Construction of asphaltconcrete base layer
 
 
1st stage of span concreting of fly-over the old water course of the river Neman
 
 
Mounting of metal span of the bridgehead between support No 1 and No 2
 
 
Reinforcement and formwork of the IInd stage of the concreting of fly-over the old water course of the river Neman
 
 
Construction of ingineering networks (electric lighting, video surveillance and security)
 
 
 
July, 2014
 
 
Mounting of drenage manholes
 
 
 
Construction of railing blocks of fly-over the old water course of the river Neman
 
 
 
Construction of span waterproofing of fly-over the old water course of the river Neman
 
 
 
Pilot installation of protective fencing fragment
 
 
 
Construction of asphaltconcrete upper layer
 
 
 
Control of laid asphaltconcrete layer
 
 
 
 
August, 2014
 
 
 
Construction of railing blocks and mounting of drenage manholes on fly-over the old water course of the river Neman
 
 
Construction of span waterproofing of fly-over the old water course of the river Neman
 
 
Mounting of axial plates of fly-over the old water course of the river Neman 
 
 
Mounting of axial plates and footway blocks of fly-over the old water course of the river Neman
 
 
Coloring of fly-over the old water course of the river Neman
 
 
Construction of asphaltconcrete upper layer
 
 
 
The contents of this publication are the sole responsibility of the Lithuanian Road Administration under the Ministry of Transport and Communications and can in no way be taken to reflect the views of the European Union.
Updated 22-09-2014